Engreen successfully completed several Solar-DG hybrid power solutions for one of the Leading Opereators of Bangladesh "BanglaLink".

In 2012 Engreen became the strategic partner of GREEN BTS Project of BanglaLink for total forty (40) sites with the vast scope including solar feasibility survey, solution, design, Equipment purchase & rollout, installation, testing and commissioning.

This project is under OPEX (PPA) model with a longer term (10 years) where Engreen is responsible for all power issues including operation & maintenance with the KPI target of 100% power availability.

The project is ongoing and currently the total completed Solar-DG Hybrid sites stands at 30 (Thirty) in no. spanning across all regions of Bangladesh.

Solar-DG Hybrid: 10 Years PPA Project with Banglalink

Features:

  • Off-Grid DG Run sites are converted to Solar Sites.
  • Avg BTS Load is 1KW.
  • Designed with ‘Zero Outage’ plan.
  • DG Runtime in down to less than 2 hours per day.

Key Challenges:

  • 40m Underground Cabling.
  • 1.5m deep Cable trench.
  • 35 rm Cables at Panel output to minimize the power loss.

1.3 KW BTS site at Harandra Bazar, Hatiya

Key Challenges:

  • Roof Top Panel mounting to integrate without additional Land.

1 KW BTS site at Jagannathpur, Sylhet.

Key Challenges:

  • Unavailability of South-facing land.
  • Innovative mounting structure design for GFRT site.
  • Solar Panel wiring in a hanging situation.